16 Drift Detection Standard

Author

UIAO Modernization Program

Published

May 6, 2026

UIAO Drift Detection & Remediation Standard

Document: 16 Phase: 5 — Data Governance Substrate Version: 1.0 Status: Draft Classification: Public Date: 2026-04-01 Promotes: PHASE5_RuntimeDriftModel.md (see that document for operational runtime detail)


1. Purpose

This document formalizes the UIAO Drift Detection & Remediation Standard — the first federated drift taxonomy with severity classification, remediation contracts, and vendor accountability requirements for federal canonical data systems. It promotes and extends PHASE5_RuntimeDriftModel.md into the numbered canon.


2. Drift Taxonomy

UIAO defines five classes of canonical drift:

Class Code Definition
Schema Drift DRIFT-SCHEMA Claim structure deviates from canonical schema version
Semantic Drift DRIFT-SEMANTIC Claim value is structurally valid but semantically stale or inconsistent
Provenance Drift DRIFT-PROVENANCE Provenance envelope is incomplete, invalid, or chain is broken
Authorization Drift DRIFT-AUTHZ Claim is transmitted outside its authorized consent envelope
Identity Drift DRIFT-IDENTITY Claim issuer cannot be resolved to a verified identity plane object

3. Severity Model

Severity Code Definition Auto-Remediate SLA
Critical P1 Claim in active use; provenance or identity drift No — halt and alert Immediate
High P2 Schema or semantic drift in a live claim Yes, if deterministic 1 hour
Medium P3 Drift in a dormant or historical claim Yes 24 hours
Low P4 Style or metadata drift; no semantic impact Yes 72 hours

4. Remediation Contract

Every adapter MUST implement the following remediation contract:

remediation_contract:
  drift_class: "{DRIFT-*}"
  severity: "{P1|P2|P3|P4}"
  detection_timestamp: "{ISO8601}"
  detected_by: "{adapter_id | workflow_id}"
  auto_remediated: true | false
  remediation_action: "halt | fix | flag | log"
  remediation_timestamp: "{ISO8601}"
  remediation_evidence: "{commit_sha or audit_record_id}"
  escalation_path: "{Canon Steward | Architecture Lead | CISO}"

5. Vendor Accountability Requirements

Certified UIAO adapters MUST:

  • Report all drift events to the UIAO telemetry plane within 5 minutes of detection
  • Maintain a 30-day drift event log accessible to the Canon Steward
  • Achieve < 0.1% P1/P2 drift rate over any rolling 30-day window to maintain certification
  • Provide remediation evidence for every P1 event within 24 hours

6. Compliance Mapping

NIST Control Drift Standard Requirement
CM-3 (Configuration Change Control) Schema drift detection and remediation
SI-7 (Software Integrity) Provenance and lineage hash verification
CA-7 (Continuous Monitoring) Automated drift detection workflow
IR-6 (Incident Reporting) P1/P2 escalation paths

7. Cross-References

  • docs/PHASE5_RuntimeDriftModel.md — Operational runtime drift model (promoted by this document)
  • docs/15_ProvenanceProfile.md — Provenance envelope that drift detection validates
  • docs/17_ConsentEnvelope.md — Authorization drift detection
  • docs/18_ClaimCatalog.md — Schema drift detection against catalog versions
  • scripts/detect_drift.py — Drift detection automation

8. Revision History

Version Date Author Summary
1.0 2026-04-01 UIAO Canon Engine Initial canonical release — promotes PHASE5_RuntimeDriftModel.md
Back to top