E. Controls + Testing

Validation suites, test frameworks, continuous monitoring, DR testing

Published

April 24, 2026

E. Controls + Testing

Controls are worthless without tests. This sub-category documents the test framework, decision trees, mock-tenant harness, and continuous monitoring loops that prove controls hold. Validation suites are paired 1:1 with adapter specs.

Leaves

  • E.1 Validation Suites — validation-suites/
  • E.2 Governance Enforcement Test Suite (MOD_J)
  • E.3 Enforcement Decision Trees (MOD_K)
  • E.4 Mock Tenant Test Harness (MOD_O)
  • E.5 Pester test framework
  • E.6 Continuous monitoring
  • E.7 DR testing
Back to top