E. Controls + Testing
Validation suites, test frameworks, continuous monitoring, DR testing
E. Controls + Testing
Controls are worthless without tests. This sub-category documents the test framework, decision trees, mock-tenant harness, and continuous monitoring loops that prove controls hold. Validation suites are paired 1:1 with adapter specs.
Leaves
- E.1 Validation Suites — validation-suites/
- E.2 Governance Enforcement Test Suite (MOD_J)
- E.3 Enforcement Decision Trees (MOD_K)
- E.4 Mock Tenant Test Harness (MOD_O)
- E.5 Pester test framework
- E.6 Continuous monitoring
- E.7 DR testing